Gateway Slope Notes #56 - Retaining Wall at Eldon Road: A lot of progress has taken place with the retaining wall near Eldon Road. The wall needs to be built to a higher elevation, and there will be a 4’ tall picket fence on top of it, 1x4 white cedar with 2” spacing. You can see the drainage pipe and the geotextile. It’s great to see the progress! #GatewaySlopeNotes